NRC Confirms Resumption of Warri–Itakpe Train Service on October 29 After Weeks of Maintenance Shutdown

The Nigerian Railway Corporation (NRC) has announced the full resumption of operations on the Warri–Itakpe Train Service (WITS), effective Wednesday, October 29, 2025. The train route, which connects parts of Delta, Edo, and Kogi States, had been temporarily suspended to allow for critical maintenance and comprehensive safety inspections along the corridor.
According to a statement from the NRC management, the suspension was necessary to ensure that the tracks, signaling systems, and rolling stock met the required operational standards before reopening to the public. The corporation emphasized that the maintenance exercise was part of its commitment to passenger safety, reliability, and improved service delivery.
The Warri–Itakpe line, one of Nigeria’s most vital intercity routes, plays a key role in supporting both passenger mobility and cargo transportation, particularly for industrial and agricultural goods moving between the South-South and North-Central regions.
The NRC also assured commuters that additional measures have been implemented to enhance comfort and punctuality, while urging passengers to make use of its digital ticketing platform for ease of booking. The corporation reaffirmed its dedication to sustaining efficient rail operations nationwide as part of efforts to revitalize Nigeria’s transportation infrastructure.


